I was able to finally get something done today. I removed the ion arm and booster tube, created a bolt pattern and boxed them up to receive their Spengler weld. Next time I see these pieces they will be ugly welded together. At that time, I will also have a new Spengler HGA. Slowly but surely this pack is coming together.
![Image]()

Statistics: Posted by edspengler — September 2nd, 2024, 10:33 pm